Sunday, July 14, 2013

Finish-A-Long Qtr. 3

she can quilt
Time, once again, to get delusional about what I can finish in the next 3 months.

I purchased this pattern and fabric back in April.    I have 35 of the 81 blocks done.  They involve quite a bit of ironing and it's been hot.  Enough said.

These blocks are from the Fat Quarter Shop BOM.  I got a bit tired of them and have 10 of the 12 done.  I think I may just sash them and be done with it.
Since all Irish babies need an Irish knit sweater, this has be be on my list.  There's a little pumpkin due on Halloween and I want to have this done by the baby shower in September.  If I have time, I may do the hat.  I haven't made this type of sweater in over 10 years so it's taking me a bit to get used to the pattern.  Once I establish the first repeat, it should go quicker.

And just for the heck of it, I'm putting these two quilts on the list again.  I didn't touch them last quarter, and probably won't this quarter either.

This is the Summersville top I started at retreat in March.  It's all pieced and just needs to be sandwiched and quilted.
This quilt top is also complete.  Assembly required.

Joyful stitching,
jane





1 comment :